濱州恒泰化纖制品有限公司主要生產(chǎn)和銷售丙綸高強(qiáng)絲,丙綸加捻網(wǎng)絡(luò)絲,聚丙烯抗裂纖維,聚丙烯工程纖維,聚丙烯腈工程纖維,聚酯工程纖維,建筑安全網(wǎng),安全防護(hù)網(wǎng),遮陽防塵安全網(wǎng),高空全身安全帶,新型歐式安全帶,高空作業(yè)清洗安全繩,三股化纖繩 濱州恒泰化纖制品有限公司主要生產(chǎn)和銷售丙綸高強(qiáng)絲,丙綸加捻網(wǎng)絡(luò)絲,聚丙烯抗裂纖維,聚丙烯工程纖維,聚丙烯腈工程纖維,聚酯工程纖維,建筑安全網(wǎng),安全防護(hù)網(wǎng),遮陽防塵安全網(wǎng),高空全身安全帶,新型歐式安全帶,高空作業(yè)清洗安全繩,三股化纖繩
               
              +  PP twisted yarn
              +  3 strands rope
              +  Braided rope
              +  8-strand and 12-strand mooring rope
              +  Double braided mooring rope
              +  Flame retardant safety rope
              +  High strength mooring rope
              +  Static rope(Technical rope / Hoisting rope)
              +  Power climbing rope
              +  High strength synthetic rope
              +  Yacht rope
              +  Para Cord
              +  Water rescue ropes
              +  Clean the rope
              +  Fire rope
              +  Physical training rope fighting strength rope
              +  Safety Net
              +  PP engineering fiber
              Home > Products
              PP twisted yarn >> High-altitude base plate  

                  

               

               

              High-altitude base plate, hanging board operation method
               1. Hanging by a suspension bracket plate, large rope (diameter 16 mm, length depending on the height of the building), hanging panels and seat belts, safety slide lock form. Before use carefully check the validity of the various components function.
               2. The two large rope (load rope and safety rope) were fixed in a safe and reliable and stand on the riveting point, after inspection and acceptance by the hand, went down from the roof, take all the rope angle, take the edge, take place with a rubber canopy bottom, to prevent friction. Large rope contact area with the building wall, to add rubber sling or safety mats.
               3. Will be hanging board, slide lock safety rope connected with a major commitment.
               4. Operators wear seatbelts, secure slide lock and the other through the root of a large rope (safety rope) connected.
               5. The operator will cut other tools installed in the pocket with spare, and then down the stairs into the hanging plate, was suspended state. Then by the staff with the roof, such as the bucket and squeegee tool to send, by hanging in the crane operator panel.
               6. Side down, side jobs until the job is completed a trip, a trip down to finish the job fell to the ground, remove the bucket, hanging panels, and then work on the roof to begin the second trip.
               Wall height to ensure safe operation in case of quality assurance.

               

              Click count:93667  Input time:2022/11/17 【Print Page】 【Return  
               
               
               
              Address:Shandong Huimin Li Town, Post Office south rope course Big World Tel:86-543-5838188 Email:sdhengtaihuaxian@163.com
              Copyright 2011 Binzhou Hengtai Chemical Fiber Co., Ltd. All rights reserved
              中國丙綸網(wǎng)優(yōu)秀供應(yīng)商
              国产v亚洲v天堂a无码99,亚洲乱亚洲乱少妇,精品欧美乱伦日韩,国产尤物在线观看不卡